SDSU Mission Valley Public Review Draft EIR
Public Review Draft EIR
Complete Draft EIR document (184MB)
Individual Sections:
- Cover
- Title Page
- Table of Contents
- Executive Summary
- Introduction
- Project Description
- Cumulative Projects and Methods
- Aesthetics
- Air Quality
- Biological Resources
- Cultural Resources
- Energy
- Geology and Soils
- Greenhouse Gas Emissions
- Hazards and Hazardous Materials
- Hydrology and Water Quality
- Land Use and Planning
- Mineral Resources
- Noise
- Population and Housing
- Public Services and Recreation
- Transportation
- Tribal Cultural Resources
- Utilities and Service Systems
- Wildfire
- Other Environmental Considerations
- Alternatives
- References
- List of Preparers
Appendices
- NOP, Initial Study, NOP Comment Letters
- Lighting Study
- Air Quality Technical Report
- Freeway Health Risk Assessment
- Biological Resources Technical Report
- Cultural Resources Technical Report
- Historic Resources Technical Report
- Energy Technical Report
- Geotechnical Report – Site Development
- Geotechnical Report – Stadium Site
- Paleontological Resources Technical Report
- Greenhouse Gas Emissions Technical Report
- Greenhouse Gas Emissions Climate Action Plan Consistency Memorandum
- Phase I Environmental Site Assessment
- Hazardous Materials Technical Report
- Report of Environmental Investigation
- Asbestos, Lead-Based Paint and Universal Waste Survey
- Limited Soil and Groundwater Investigation Along Fuel Pipeline
- Addendum 8 to CAO 92-01
- Abandonment Permit from the County of San Diego
- Water Quality Technical Report
- Hydrology Report
- Drainage Study
- Water Quality Report for SDSU Mission Valley Campus
- Hydraulic Analyses for the SDSU Mission Valley Campus
- Construction Excavation Impacts on Groundwater Storage
- Noise Technical Report
- Fiscal Impact Analysis
- Transportation Impact Analysis
- Sewer Study
- Water System Analysis
- Onsite Drainage Study
- Offsite Drainage Study
- Water Use Estimation
Public Review Period
The Draft EIR 60-day public comment period closed on October 3, 2019.
Please direct all comments to: Laura Shinn, Director; Facilities Planning, Design, and Construction; San Diego State University, 5500 Campanile Drive, San Diego, California 92182-1624 or via email to: [email protected].
Following the close of the public comment period, responses to comments on the Draft EIR will be prepared and, together with the Draft EIR, will constitute the Final EIR. For responses to be included in the Final EIR, all written comments on the adequacy of the Draft EIR must be received no later than 5:00 P.M. on October 3, 2019. This notice will be filed with the San Diego County Clerk’s office for a period of not less than 60 days.
SDSU hosted three public meetings during the DEIR comment period that will allow the public an overview of the findings of the Draft EIR, including presentations from the technical team that worked on the analysis. All CEQA-related comments submitted in writing and received during the extended 60-day comment period will be responded to in the Final EIR. Meetings will be open to the campus community and members of the public and will be held at the following times and locations:
- Thursday, Sept. 12, 2019, 12 p.m. to 1:30 p.m. at SDSU’s Parma Payne Goodall Alumni Center, 5250 55th St, San Diego, CA, 92182. A parking garage is located just south of the building.
- Thursday, Sept. 12, 2019, 5:30 p.m. to 7 p.m. at SDSU’s Parma Payne Goodall Alumni Center, 5250 55th St, San Diego, CA, 92182. A parking garage is located just south of the building.
- Tuesday, Sept. 24, 2019, 5:30 p.m. to 7 p.m. at the Mission Valley Marriott, 8757 Rio San Diego Dr, San Diego, CA 92108.
- San Diego State University Mission Valley Campus Master Plan Environmental Impact Report
If you have questions or comments, please email: [email protected]